This master bedroom en-suite was in desperate need of refurbishment. The exiting unit hadn’t been used for months due to leaky pipe work and the neglect lead to deterioration of the whole room. This remodel was a quick turnaround, stripping out the existing unit and running completely new
pipe work to the brand new shower room suite with a half tiled finish to the rest of the room.

Existing dated toilet with surface ugly visible surface run pipe work.

Chunky and dated existing basin, eating up unnecessary space in the room fixed to the wall to be demolished.

large shower tray located in which use to be the cloak room, this is spacious enough for our client to put a seat in the shower to sit comfortably whilst they wash rather than stand the whole time in pain.

New modern style toilet was a basin situated on top of the toilet cistern. Wood effect tiles on the floor and boxed in waste, and feed pipes to facilities and towel rail.